A supplementary study on determining the amount of precipitation water – Poznań

Redevelopment of the Old Market square – a supplementary study on determining the amount of precipitation water on the area of the Old Market Square (Poznań).

 

Project aim

The aim of the project was to prepare a concept plan of stormwater drainage system of the Old Market Square area in Poznań and implementation of partial stormwater retention and reusing it in-situ. (in order to resign from the current “collect and drain” concept).

 

Project description

The project included:

 

  • preparing precipitation model – design rainfall intensity model for the city of Poznań,
  • determining the maximum value of stormwater runoff,
  • determining watershed boundaries of the Old Market Square,
  • sporządzenie wielowymiarowej  koncepcji  systemu  odprowadzaniu  wód opadowych,  preparing a multidimensional concept of a stormwater drainage system,
  • estimating the costs of the investment,
  • selecting the best locations for retention basins installation.

 

Solutions applied

Bentley’s CivilStorm CONNECT Edition software for hydrodynamic modelling and gravity stormwater drainage systems was used to prepare the design.

 

Back