A supplementary study on determining the amount of precipitation water – Poznań

Redevelopment of the Old Market square – a supplementary study on determining the amount of precipitation water on the area of the Old Market Square (Poznań).

 

Project aim

The aim of the project was to prepare a concept plan of stormwater drainage system of the Old Market Square area in Poznań and implementation of partial stormwater retention and reusing it in-situ. (in order to resign from the current “collect and drain” concept).

 

Project description

The project included:

 

  • preparing precipitation model – design rainfall intensity model for the city of Poznań,
  • determining the maximum value of stormwater runoff,
  • determining watershed boundaries of the Old Market Square,
  • sporządzenie wielowymiarowej  koncepcji  systemu  odprowadzaniu  wód opadowych,  preparing a multidimensional concept of a stormwater drainage system,
  • estimating the costs of the investment,
  • selecting the best locations for retention basins installation.

 

Solutions applied

Bentley’s CivilStorm CONNECT Edition software for hydrodynamic modelling and gravity stormwater drainage systems was used to prepare the design.

 

Back
Popup